After the devastation of Cyclone Larry on the 20th March 2006, TWS were engaged to renovate high altar and altar rails and redesign main altar and lecturn, and supply marble flooring. [More]
Jindalee Church
TWS were engaged to install a solid Cararra Marble Altar Table, Lectern and Tabernacle Stand all with Timber clad steel frame bases. [More]